Project Description
A water tank with a capacity of 1,500 m3 was commissioned in Arar, KSA, by the Saudi Arabia Ministry of Water & Electricity. UPG Engineering developed detailed structural design of GRC façade cladding units and the supporting steel structure. Our coordinated BIM models helped keep track of the construction progress and minimized site errors risk. Detailed BIM models were also used for disciplines coordination, clash detection and for generation of all the detailed production and installation drawings.